Category: <span>Featured</span>

Silk Belt needs UNECE Water Convention

Seventh session of the Meeting of the Parties to the Water Convention is being held in Budapest on 17 – 19 November 2015. Convention is opening for accession by countries from outside of UNECE region. On the first day meeting participants discussed what are main objectives and geographic priorities for …

Baikal World Heritage, World Bank and Dams – Two Steps in Right Direction

World Bank Agreed That Arguments Against Dams In Selenge Basin Are Valid. -World Heritage Committee Requested Environmental Assessments – Will Mongolia listen? Baikal and Hydropower Lying in the heart of Siberia Lake Baikal fed by Selenge River is the oldest freshwater depository on Earth containing 20% of drinkable water of …

A Second Call from the “Rivers of Siberia” International Conference

The 9th International Conference “the Rivers of Siberia and the Far East” Irkutsk, Russia November, 10-11, 2015 The Second Announcement The 9-th International Conference “The Rivers of Siberia and the Far East” will be held on November, 10-11, 2015 in Irkutsk City, Russia near Lake Baikal. The Conference is dedicated …

Can the World Heritage Convention save Lake Baikal from hydropower?

This session of the World Heritage Committee (WHC) was crucial for the Lake Baikal: WHC had to decide whether to allow it to become a technocratic reservoir system managed primarily for hydropower in the interest of industry or it should be managed as a World Heritage site for the benefit …

Vladimir Putin promised to deal with Mongolian hydropower ?

This was allegedly promised by President of the Russian Federation during Media Forum United National Front in St. Petersburg reports Buriatia Business Portal . On April 25-28, St. Petersburg hosted the second Media Forum of the All-Russian People’s Front. At the forum held a plenary session with Vladimir Putin, during …

People of Selenga-Baikal Basin address the World Bank Inspection Panel

People living in the basin of the Selenga river in Russia and Mongolia, together with a number of environmental NGOs, filed a petition to the World Bank Inspection Panel demanding that the feasibility studies of dangerous hydro-electric power plants (HPP) projects must be postponed and the WB MINIS project thoroughly …